Underfoot
Currently booking installs about three weeks out. Get on the calendar

Flooring · Providence, RI

Floors for Providence homes, priced by the square foot before anything comes up.

Owner-installed hardwood, LVP, tile and carpet across greater Providence. Written square-foot pricing before demo day, and a subfloor we test rather than guess at.

On the tools
14 yrs
Crews at once
One
Labour warranty
2 yrs

What we install

Four materials, and what each really costs installed.

Ranges are dollars per square foot with materials, labour and basic prep together — the number you actually pay, not a labour-only teaser.

Solid & engineered hardwood

$6–$25 / sq ft installed

$10–$16 is where most Providence jobs land

Refinishable, and the only floor that adds to an appraisal in this housing stock. Species, grade and plank width move the number more than labour does.

Best for: Living rooms, dining rooms, bedrooms, main stairs

Luxury vinyl plank

$4.5–$12 / sq ft installed

The honest answer for most basements and baths

Waterproof wear layer, floats over most flat substrates, and the good ones no longer look like a rental. Cannot be refinished — when it wears, it is replaced.

Best for: Basements, kitchens, bathrooms, rentals, homes with big dogs

Porcelain & ceramic tile

$10–$31 / sq ft installed

Averages about $18 installed

The most durable thing we install and the most expensive to remove later. Layout and substrate drive the price far more than the tile you pick.

Best for: Bathrooms, mudrooms, entryways, radiant-heat rooms

Carpet & runners

$3–$11 / sq ft installed

Cheapest per foot, shortest life

Quiet, warm and forgiving underfoot. It is not a moral failure in a bedroom, whatever the renovation shows have told you.

Best for: Bedrooms, finished attics, stair runners, home offices

Which floor for which room

Where each material is wrong.

Three of these six rows talk you out of the more expensive option. A comparison where every answer is the thing we most want to sell is an advert, not advice.

Below grade — basements

LVP

Do not let anyone sell you solid hardwood below grade. Slab moisture will cup it inside two heating seasons no matter how good the install is.

Cheaper than our best margin

Kitchens

LVP or tile

Engineered hardwood survives a kitchen, but a dishwasher line lets go once and you have replaced a floor. We would rather sell you the cheaper material here.

Cheaper than our best margin

Full bathrooms

Tile

The one room where the expensive answer is also the right one. Sheet vinyl seams fail at the tub, and they fail where you cannot see them.

Living & dining rooms

Hardwood

Refinishable three or four times over its life, and the floor buyers in this market expect to see on the main level.

Bedrooms

Carpet or hardwood

If the budget is tight, carpet the bedrooms and put the money into the main level. Nobody photographs a bedroom floor.

Cheaper than our best margin

Entry & mudroom

Tile

Rhode Island road salt and February slush. Tile with a sealed grout is the only thing that shrugs it off.

The part nobody photographs

The subfloor decides whether the floor lasts.

Every failed floor we are called to fix failed underneath. None of this work shows up in a before-and-after photo, which is exactly why it gets skipped.

01

Moisture, measured

Concrete gets an in-situ relative-humidity probe; wood subfloors get a pin meter. We record the numbers and give them to you. Manufacturers void warranties over exactly this, and "it looked dry" is not a reading.

02

Acclimation

Wood sits in your house, in the room it will live in, until its moisture content matches the space. Rushing this is the most common cause of gaps in January.

03

Flatness

Most manufacturers want 3/16" over 10 feet. Older Providence floors rarely start there, so the quote includes what levelling we can see — and says plainly what we cannot see until the old floor is up.

04

The old floor comes up

Carpet, tack strip, staples, and any layers a previous owner floated over. Homes here often have three generations of flooring stacked up. Disposal is in the number.

Read the full Subfloor & Moisture Report →

Recent floors

Six jobs, led by what was actually wrong.

Refinish

Federal Hill triple-decker, second floor

Problem
Carpet over 1920s pine that three owners had painted around.
What we did
Original pine sanded and refinished; 620 sq ft.

Hardwood

Cranston ranch, whole main level

Problem
Four rooms, four different floors, four different heights.
What we did
One engineered oak throughout, thresholds gone.

LVP

Pawtucket mill loft

Problem
Concrete slab reading 84% RH — hardwood was off the table.
What we did
Floating LVP over a vapour barrier, 1,100 sq ft.

Tile

East Side bathroom

Problem
Sheet vinyl lifting at the tub, subfloor soft underneath.
What we did
Subfloor section replaced, porcelain hex laid.

Carpet

Barrington bedrooms

Problem
Budget would not stretch to hardwood upstairs.
What we did
Wool-blend carpet in three bedrooms; the hallway got oak.

Hardwood

Providence two-family, stairs

Problem
Treads worn through at the nose, landlord-grade paint.
What we did
Treads capped in white oak, runner over the top.

How a job runs

Five steps, and you know the number before step four.

  1. 01

    Measure

    We measure the actual rooms, not a sketch. Half an hour, no charge, no pitch.

  2. 02

    Samples in your light

    Three or four boards left at the house for a few days. Flooring never looks the same in a showroom as it does in your hallway.

  3. 03

    Written price

    A fixed square-foot number with the prep itemised, and the specific conditions that would change it spelled out. You have this before anything is torn up.

  4. 04

    Demo and prep

    Old floor out, subfloor tested and levelled. This is where a surprise, if there is one, shows up — and you hear about it that day, with a price.

  5. 05

    Install and finish

    One crew, one job, start to finish. Trim, transitions and thresholds included. We take the debris with us.

Where we work

Greater Providence and the East Bay.

Providence

Federal Hill · East Side · Elmhurst · Olneyville · Mount Pleasant

East Bay

Barrington · Warren · Bristol · East Providence · Riverside

South & West

Cranston · Warwick · Johnston · West Warwick · North Kingstown

Blackstone Valley

Pawtucket · Central Falls · Lincoln · Cumberland · Woonsocket

Pricing

What the number includes, and what changes it.

For scale: a 500 sq ft space runs roughly $1,529–$4,860 installed nationally, averaging about $3,160 — near $12.50 a square foot blended across materials.

In the square-foot price

  • Removal and disposal of the existing floor
  • Moisture testing, with the readings written down
  • Levelling up to 1/4" over 10 feet
  • Trim, transitions, thresholds and shoe moulding
  • Moving ordinary furniture — we do the lifting
  • Daily clean-up, and the dumpster

Priced separately, always in writing first

  • Structural subfloor repair found after demo — quoted that day, in writing, before we continue
  • Asbestos-backed sheet vinyl (common here pre-1985) — abatement is a licensed trade, not us
  • Levelling beyond 1/4" over 10 feet
  • Stair work, which is priced per tread rather than per foot
  • Moving a piano, a safe, or a full-wall aquarium

Customers

What Providence homeowners say.

“Marisol talked us out of hardwood in the basement and into vinyl, which cost her money. Two winters later the floor is flat and I understand why she did it.”

Danielle R. · Cranston

“She found rot under the old tile on day one, sent a photo and a price the same afternoon, and it did not move after that. That is the whole thing, really.”

Anthony P. · Pawtucket

“The pine under our carpet was in worse shape than anyone thought. They saved it anyway. It looks a hundred years old, which is the point.”

Hyun-woo K. · East Providence

“Quoted three companies. Underfoot was the only one who measured the rooms and the only one who mentioned moisture at all.”

Grace M. · Barrington

Who turns up

Hi, I'm Marisol Tavares.

I have been laying floors in Rhode Island for 14 years, the last six under my own name. I run one crew and one job at a time, which means I am on site rather than in a truck between four of them.

Most of my work is in houses built before 1940. Nothing in them is flat and nothing is square, and pretending otherwise at quoting time is how a job ends in a change order neither of us wanted. So I measure the deflection, test the moisture, and tell you what I found before you have committed to anything.

RI Contractor Registration #CR-40218

What I will talk you out of

  • Solid hardwood below grade, every time, no exceptions.
  • Floating anything over a subfloor that has not been tested.
  • Matching a 1920s pine floor exactly. It cannot be done, and the attempt looks worse than an honest contrast.
  • Doing the whole house at once when doing the main level well would serve you better.

Common questions

Before you call.

Do you sell the flooring, or just install it?

Both. We buy at trade pricing and pass the invoice through at cost, with our labour priced separately — so you can see what the material actually cost. You are also welcome to supply your own; the labour rate does not change.

Can I put hardwood in my basement?

Not solid hardwood, no. Below grade, slab moisture moves through concrete year-round and will cup solid wood within a couple of heating seasons. Engineered wood is sometimes viable over a tested slab with a vapour barrier; LVP nearly always is. We will test before answering.

How long does a floor take?

A single room is usually a day or two. A main level runs three to five days, plus acclimation time before we start — typically three to five days for solid wood. Refinishing adds drying time between coats and you will want to be out of the house for it.

What is the mess like?

Demo is loud and dusty. Sanding is worse, though we run dust containment and it is far better than it was ten years ago. We seal off the rooms we are not working in, and we clean daily rather than at the end.

My house is from 1910 and nothing is level. Is that a problem?

It is normal here, and it is the reason the quote has a levelling line in it. We measure the deflection before quoting, so the allowance is based on your floor rather than an average. What we cannot promise is what is under the old floor until it is up.

Do you do stairs?

Yes, priced per tread rather than per square foot — a staircase is joinery, not flooring, and pretending otherwise is how people end up with a change order.

Is there a warranty?

Two years on our labour. Material warranties come from the manufacturer and most of them hinge on documented moisture readings and acclimation, which is exactly why we record ours and hand them to you.

Do you take on small jobs?

A single room, a closet, a landing — yes. There is a minimum that covers a day on site, and we will tell you what it is on the phone rather than after the visit.

Get a quote

Tell me about the rooms.

Rough square footage is fine — I measure properly on the visit. Fields marked with an asterisk are required.

This demo form posts nowhere. Point site.formAction at your own endpoint.

Still deciding between materials?

That is the call I would rather have early. Half an hour at the house, samples left behind, no charge and no pitch.