the billing line that quietly under-invoices you every month

There is one line on a progress payment application that almost everyone fills in with the wrong number. It deducts your retainage twice. Each month looks internally consistent, so nothing ever flags it — you just get less money than you are owed, forever.

$89 one-off 8 tabs Excel + Google Sheets 6 pre-submission checks Change order log
the billing line that quietly under-invoices you every month — Excel and Google Sheets workbook
The short answer

A progress billing application asks how much of each contract line you have completed, adds any materials stored on site, subtracts retainage, and then subtracts what you have already been paid for.

That last subtraction is where it goes wrong. The “less previous certificates” line must be the prior period's total earned less prior retainage — not the cheque you received, and not the prior net line. Using the cheque deducts retainage a second time and under-bills you every single month.

Why the same money gets deducted twice

Progress billing works like this. You have done 60% of a $100,000 contract line, so you have earned $60,000. The customer holds back a percentage — call it 10% — as retainage, money kept until the job is finished and signed off. So this month you can invoice $54,000.

Next month you are at 75%. You have now earned $75,000, retainage is $7,500, so your total invoiceable to date is $67,500. You have already been billed for some of that, so you subtract what came before and bill the difference.

Subtract what, exactly? If you subtract the $54,000 cheque, you get $13,500. If you subtract the prior earned-less-retainage figure — which is also $54,000 — you get the same answer. On a simple line they agree, which is exactly why the error survives.

They stop agreeing the moment retainage changes, or stored materials are involved, or a change order lands mid-job. And when they diverge, the cheque figure is the one that is wrong, because it has already had retainage taken out of it once.

Work completedplus stored materialsLess retainagewhat the customer holdsbackTotal earned to datenet of retainageLess previousthe cheque? or priorearned-less-retainage?
The last step is a subtraction, and what you subtract decides whether you get paid what you earned. Subtract the cheque and retainage comes off twice.

What it costs on one application

The sample project in the workbook is a $2,931,300 contract. Here is the retainage line calculated the correct way against the naive way, on a single month's application.

Line 7, retainage, on the sample payment application
Retainage on this applicationEffect on what you get paid
Net of prior retainage — correct$1,046,403You invoice everything you have earned this period.
Gross, ignoring prior retainage$1,162,670Retainage deducted a second time on money already held back.
Under-billed by$116,267On one application

$116,267 that you have earned, that the customer is not disputing, and that you simply did not ask for. And because each month's application is internally consistent, no review catches it — you would have to compare against a correctly built one to see it.

The three rules the workbook enforces

Beyond that one line, two more rules decide whether an application survives review.

Stored materials are not completed work. They usually carry their own retainage rate, and when the material is installed it moves out of stored and into completed — never counted in both at once, which is an easy way to bill the same thing twice.

Only approved change orders move the contract sum. Pending ones do not, however confident you are. And every approved change order needs its own line on the schedule of values, or there is nothing to bill against.

Line 6 on last month'sapplicationwhich number goes here?Prior earned less prior retainagecorrect - derived, never typedThe cheque you actually receiveddeducts retainage a second time
They give the same answer on a simple line, which is why the wrong one survives for years. They diverge the moment retainage or stored materials move.

How to build a payment application that gets approved

1

Break the contract into a schedule of values

Every line of work, with the value assigned to it. The workbook checks that the total matches the contract sum to date — on the sample project both sides are $2,931,300 — and tells you if they diverge.

2

Record progress on each line

Previous periods plus this period gives total completed. The workbook will not let a line be billed beyond its scheduled value, which is one of the six controls.

3

Add stored materials separately

The sample application carries $46,370 of stored materials at its own rate. They are on the application, they are separated from completed work, and when they get installed they move across rather than being counted twice.

4

Take retainage net of what is already held

This is the rule the product exists for. The workbook derives the previous figure from prior completed plus prior stored, so it cannot be typed in wrong. You are not trusted with it, and neither am I.

5

Run the checks before you send it

Six controls run automatically and produce one verdict. On the sample data it reads READY TO SUBMIT. If it does not, it names which control failed rather than leaving you to find it.

What is inside the file

Eight tabs, built around a $2.9M sample project with three approved change orders and stored materials on site, so every rule is visibly exercised.

All 8 tabs in Progress Billing & Schedule of Values Workbook
TabWhat it does
Start HereWhat to fill in, in what order, and how to import the file into Google Sheets.
Schedule of ValuesEvery scheduled item with its value. Checked against the contract sum.
ApplicationThe payment application itself — completed, stored, retainage and the amount due.
SummaryThe top-line figures for the period, in the order a reviewer reads them.
Change OrdersApproved and pending, kept apart. Only approved ones move the contract sum.
RetainageWhat is held, on what, and at what rate — including a separate rate for stored materials.
ChecksSix controls that run before you submit, and one overall verdict.
How It WorksEvery formula and every rule, written out.
The Application tab of the progress billing workbook showing completed work, stored materials, retainage and the amount due this period
The Application tab of the workbook you download, with the sample data it ships with. Line 7 is derived, not typed — which is the whole point.

Opening it in Excel, Google Sheets or Numbers

It is one .xlsx file. There are no macros, no add-ins and nothing to install, which is what makes it portable — a macro-driven template would be Excel-only.

Where the file opens, and how
AppHow to open it
Microsoft ExcelDouble-click the file. Excel 2016 and later, and Microsoft 365, on Windows or Mac. Nothing to enable and nothing to install.
Google SheetsGo to Google Drive, click New → File upload and pick the .xlsx. Then double-click it in Drive and choose Open with → Google Sheets. To keep a native copy, use File → Save as Google Sheets. Formatting and formulas both carry over.
Apple Numbers (Mac, iPad, iPhone)Numbers opens .xlsx directly — double-click it, or in Numbers use File → Open and select the file. Numbers converts it on open and will list anything it changed. To send a copy back to someone on Excel, use File → Export To → Excel.
LibreOffice CalcFree, and opens the file as-is on Windows, Mac and Linux. This is what I use to recalculate every workbook when I check the maths, so it is the app these files are tested hardest in.

Every formula in this workbook uses ordinary functions — SUM, IF, INDEX, MATCH and their relatives. Nothing here is Excel-only.

Get the workbook

$89 one-off · no subscription

  • One .xlsx file, eight tabs, works in Excel, Google Sheets, Numbers and LibreOffice
  • A $2.9M sample project with change orders and stored materials already filled in
  • Retainage taken net of prior retainage, derived so it cannot be mistyped
  • Six pre-submission controls with a single clear verdict
  • Free lifetime updates
Get it on Gumroad →

Instant download from Gumroad. Computes the figures a payment application needs. It is not a copy of any standard form.

Below here is the arithmetic

The arithmetic, written out

The application is a chain of subtractions, and each line depends on the one before it.

total completed and stored  = previous periods + this period + stored materials
retainage held to date      = (completed x rate) + (stored x stored rate)
total earned less retainage = total completed and stored - retainage held
less previous certificates  = PRIOR (total completed and stored - retainage held)
current payment due         = total earned less retainage - less previous certificates
balance to finish           = contract sum - total completed and stored

Line 4 is the one that matters. It is the prior period's line 3, recomputed from prior completed and prior stored — not the cheque, and not a number anyone types.

On the standard industry forms

This workbook does not reproduce AIA Document G702 or G703, in whole or in part — no layout, no wording, no facsimile. Those forms are copyrighted by the American Institute of Architects and licensed separately. What this computes is the figures a payment application requires, which you then transcribe onto whatever form your contract calls for. Arithmetic is not copyrightable; forms are.

How I know the numbers are right

Seventeen value checks plus the identities a payment application has to satisfy. Last run: 0 mismatches, 0 property failures, 0 formula errors. Among them: the schedule of values totals to the contract sum ($2,931,300 on both sides), line 6 equals line 4 minus 5, line 8 equals 6 minus 7, line 9 equals 3 minus 6, pending change orders are excluded from the contract sum ($27,800 correctly left out), and every approved change order has its own schedule line.

One bug worth describing, because it is a trap in any spreadsheet. The over-billing control was written as SUMPRODUCT(--(G > C + 0.01)) and reported 17 violations on clean data — which turned out to be the 17 empty rows. A blank cell holding "" is text, and in a spreadsheet text compares greater than any number, so "" > 0.01 is TRUE. It is guarded with ISNUMBER now. If a check formula in any spreadsheet ever reports an implausible count, look for this.

Compared with the alternatives

What else you could do instead
CostRetainage ruleStored materialsPre-submission checks
This workbook$89Net of priorSeparatedSix
A free billing template$0Usually grossMixed inNone
Construction billing software$100–$400 / monthCorrectYesYes
Rebuilding it each month$0Whatever you rememberVariesNone

Questions people ask before buying

What is retainage?

Money the customer holds back from each payment — often 5 or 10 percent — until the job is finished and signed off. You have earned it, but you do not get it yet.

What is the 'less previous certificates' line supposed to be?

The prior period's total earned less prior retainage. Not the cheque you were paid, and not the prior net amount due. Using the cheque deducts retainage twice and under-bills you every month.

Does this include the AIA G702 and G703 forms?

No. Those forms are copyrighted by the American Institute of Architects and licensed separately. This workbook computes the figures a payment application needs, which you transcribe onto whatever form your contract requires.

How are stored materials handled?

On their own line, with their own retainage rate, and they move into completed work when they are installed rather than being counted in both places.

What about change orders?

Approved ones move the contract sum and each gets its own schedule of values line. Pending ones are logged but excluded — on the sample project that is $27,800 correctly kept out.

Will it work in Google Sheets?

Yes. Upload the .xlsx to Google Drive and open it with Google Sheets. No macros, no add-ins.

Can I use it on a Mac without Excel?

Yes. Apple Numbers opens the file directly, and LibreOffice Calc is free.

What are the six checks?

Schedule of values totals to the contract sum, no line billed past its scheduled value, every approved change order has a line, the arithmetic identities between lines hold, stored materials are present and separated, and pending change orders are excluded. They produce one verdict.

Related spreadsheets

Ready to stop doing this by hand?

$89 one-off · no subscription

  • One .xlsx file, eight tabs, works in Excel, Google Sheets, Numbers and LibreOffice
  • A $2.9M sample project with change orders and stored materials already filled in
  • Retainage taken net of prior retainage, derived so it cannot be mistyped
  • Six pre-submission controls with a single clear verdict
  • Free lifetime updates
Get it on Gumroad →