Principal designer · Santa Fe, NM

A trade discount isn’t your money until the fee model says whose it is.

Full-home and room-by-room residential design in Santa Fe. Every engagement here carries a published fee-model comparison and a written markup disclosure — the paperwork a portfolio site conventionally hides behind “contact for pricing.”

A turquoise-trimmed window set into a warm, hand-troweled lime-plaster adobe wall in Santa Fe

One flagship engagement, followed room by room

Projects

Not a generic “recent work” grid — the Acequia Madre Adobe Remodel carries one coherent FF&E schedule, finish schedule and room-by-room scope table, shown in full further down this page.

Rooms in scope
6
Square footage
2,450 sq ft
Duration
9 months, design through install
Budget band
$180K–$260K (design + FF&E + install)
A living room with exposed wood ceiling beams, a stone fireplace and warm wood flooring

Living room

The fireplace surround and flooring were kept; the seating plan and lighting were redrawn around them.
A residential kitchen mid-renovation with white cabinetry, stone countertops and pendant lighting

Kitchen

Cabinetry, counters and the island were replaced; the window placement stayed, driving the layout.
A primary bedroom with a vaulted wood-plank ceiling, exposed beams and a reupholstered headboard

Primary bedroom

The vaulted ceiling was original; everything under it — bedding, rug, casegoods — is new to the FF&E schedule below.
A bathroom with warm ceramic tile, a glass-block accent wall and a deep soaking tub

Primary bath

The glass-block wall borrows daylight from an interior hallway without sacrificing privacy.
Hand-woven textiles hung to air over a stone courtyard wall beside a painted blue gate

Courtyard entry

The entry sequence — gate, portal, courtyard — was scoped and specified alongside the interior rooms, not treated as landscaping.
A close-up of an exposed wood-plank ceiling and structural beams

Ceiling detail

The vigas and plank ceiling throughout the house set the material vocabulary every finish decision answers to.

Published, not “contact for pricing”

Fee models

Four real fee structures the trade actually uses, compared side by side. Most Griego Interiors engagements are hybrid: a flat fee for the design phases, and cost-plus (disclosed markup) on FF&E — the honest, most common real-world pairing.

How each model differs

Model, typical range, what’s billed, what’s disclosed
Model Typical range What’s billed What’s disclosed
Flat fee (design phases) $2,000–$50,000+ per project, scoped to phase Design time only — concept, drawings, specifications The flat fee itself; procurement is billed and disclosed separately
Hourly $125–$450/hr, by market and experience Time actually spent, logged and invoiced Hourly rate and logged hours; no markup unless procurement is added
Percentage of budget 10–30% of total project cost Design and procurement together, as one percentage The percentage and the budget it applies to; trade cost is not separately itemized
Cost-plus (FF&E markup) 30–50% markup over trade cost Furniture, fixtures and equipment procured on the client’s behalf Both trade cost and client price, line by line, on the FF&E schedule

Trade discounts & disclosure

Trade pricing runs roughly 20–60% below retail, and it varies by brand, category and a designer’s own volume with that vendor — there is no single published rate card, so any site claiming one fixed discount is already overstating its own precision. Ranges below are typical, not guaranteed.

What ASID 3.3 requires

The ASID Code of Ethics, Section 3.3, states plainly: “Members shall fully disclose to a client all compensation that the member shall receive in connection with the project and shall not accept any form of undisclosed compensation from any person or firm with whom the member deals in connection with the project.” That written disclosure is what the FF&E schedule further down this page exists to satisfy.

Category, trade discount range, client markup range, ASID note
Category Trade discount Client markup ASID 3.3 note
Furniture (casegoods & upholstery) 20–50% below retail 30–50% over trade cost Disclosed on the FF&E schedule, per item
Lighting 20–40% below retail 30–45% over trade cost Disclosed on the FF&E schedule, per item
Textiles & window treatments 25–60% below retail 35–50% over trade cost Disclosed on the FF&E schedule, per yard/item

Because the fee model chosen determines what gets disclosed and when, the summary below shows what a cost-plus client actually sees on paper, next to what a flat-fee client sees, line by line.

Trade cost per item
Cost-plus: Shown on the FF&E schedule · Flat-fee: Not itemized — procurement fee only
Client price per item
Cost-plus: Shown on the FF&E schedule · Flat-fee: Shown on the FF&E schedule
Markup percentage
Cost-plus: Stated in the signed agreement, per ASID 3.3 · Flat-fee: Not applicable — no per-item markup
Procurement fee
Cost-plus: Included in the FF&E markup · Flat-fee: A separate, stated flat or hourly fee
A fan of patterned fabric swatches used to select upholstery and drapery materials

Material samples like these are specified against the finish schedule below, not sold from this page.

Acequia Madre Adobe Remodel — sample schedule

FF&E schedule

Furniture, fixtures and equipment for the flagship project, with trade cost and client price shown on the same line — the disclosure the cost-plus model above commits to in writing.

Reading the schedule

Item, room, vendor, trade cost, client price, lead time, status
Item Room Vendor Trade cost Client price Lead time Status
Sectional sofa, performance weave Living room Trade showroom, Albuquerque $3,200 $4,480 10–12 weeks Ordered
Reclaimed-wood console table Living room Local maker, Santa Fe $1,450 $1,958 4–6 weeks In production
Counter-height bar stools (x4) Kitchen Trade showroom, Denver $1,840 $2,576 6–8 weeks Confirmed
Pendant lighting (x3) Kitchen Lighting agent, national $2,100 $3,045 3–5 weeks Shipped
Platform bed frame, walnut Primary bedroom Trade showroom, Albuquerque $2,600 $3,510 8–10 weeks Ordered
Hand-loomed wool area rug Primary bedroom Textile importer, Santa Fe $1,900 $2,755 2–4 weeks Received
Total, this sample $13,090 $18,324 Markup this sample: 40%, computed from the rows above

Acequia Madre Adobe Remodel — sample schedule

Finish schedule

Every surface material, brand and install note for the flagship project — the document a contractor cross-checks against on site.

Reading the finish schedule

Surface, material, brand/line, finish, install notes
Surface Material Brand / line Finish Install notes
Kitchen counters Quartzite slab Antolini, "Fantasy Brown" Honed Template after cabinets are set; 2-week fabrication lead
Primary bath floor Ceramic tile Marazzi, "Terra Santa" Matte, slip-rated Heated floor substrate installed first
Living room floor Existing wood, refinished On-site sand and seal Low-sheen wax Refinish scheduled after all trades but before FF&E delivery
Interior walls, living areas Lime plaster, repaired Master craftsman, hand-troweled Natural, unpainted Matches original 1930s wall texture; no drywall patches
Primary bedroom ceiling Existing viga & plank, cleaned On-site conservation Natural, sealed Structural review before any fixture is hung from a beam
Courtyard gate & trim Painted wood Custom millwork, exterior enamel Satin, regional blue Weather-sealed before monsoon season

Acequia Madre Adobe Remodel

Room-by-room scope

Current condition and scope level, room by room — the table a client uses to see what’s structural, what’s cosmetic, and how long each room realistically takes.

Reading the scope table

Room, current condition, scope level, estimated timeline
Room Current condition Scope level Estimated timeline
Living room Original beams and fireplace sound; furnishings dated Full refresh, structure retained 6 weeks design + 10 weeks procurement
Kitchen 1990s remodel, failing cabinetry Full renovation to studs 4 weeks design + 12 weeks build
Primary bedroom Original ceiling sound; finishes dated Full refresh, structure retained 4 weeks design + 8 weeks procurement
Primary bath Original 1970s fixtures, failing grout Full renovation to studs 4 weeks design + 10 weeks build
Courtyard & entry Gate and portal sound; plantings overgrown Light refresh, hardscape retained 2 weeks design + 4 weeks install
Guest room Unused storage space Conversion to functional guest room 3 weeks design + 8 weeks procurement

Bands, sourced from current trade and vendor data — not promises

Procurement timeline

Lead times vary widely by category. Custom upholstery and imported goods carry the longest, most variable ranges — stated here as bands, not guaranteed dates.

Category, typical lead time
Category Typical lead time
In-stock goods 1–2 weeks
Quick-ship program pieces 2–4 weeks
Custom upholstery (COM) 10–14 weeks
Case goods (tables, casegoods) 8–12 weeks
Lighting, made-to-order 3–6 weeks
Imported goods 14–22 weeks

Procurement sequence

A genuinely different chronological list from the design process below — this is the path a purchase order follows once the FF&E schedule is signed off.

  1. Spec approved Client signs off on the FF&E schedule — trade cost, client price and lead time all visible.
  2. PO placed A purchase order is issued to the vendor or trade showroom at the negotiated trade cost.
  3. Order confirmed The vendor confirms the order and a production or ship date.
  4. QC / receiving Goods are received at a trade receiving warehouse and inspected before delivery.
  5. White-glove delivery Items are delivered and placed in the finished room, packaging removed off-site.
  6. Install Final styling and placement, checked against the room-by-room scope.

Preparing your home for install week

  1. Clear the room Existing furniture not staying is removed or relocated before delivery day.
  2. Confirm access Gate codes, parking and stair widths are confirmed with the delivery crew in advance.
  3. Protect finished surfaces Refinished floors and fresh plaster are given cure time before heavy items are moved across them.
  4. Walk-through A final walk-through against the room-by-room scope table closes out the install.

Discovery through reveal

Design process

Six phases, the same spine the FF&E schedule and procurement sequence above are keyed to.

The six phases

  1. Discovery Room-by-room scope, budget band and the client’s own list of must-keeps are documented — the worksheet below starts here.
  2. Concept A material and furnishing direction is presented against the finish schedule’s categories.
  3. Design development The FF&E and finish schedules are built out, line by line, with trade cost and client price both visible.
  4. Procurement Purchase orders are placed against the approved schedule — the sequence in the Procurement section.
  5. Install White-glove delivery and placement, checked against the room-by-room scope.
  6. Reveal A final walk-through with the client, and the project moves from the FF&E schedule to the completed-work record.

Named clients, tied to specific rooms

What clients say

“Marisol showed us the trade cost and the markup on the same line, before we signed anything. Nobody else we called would put a number on paper.” — Client, Acequia Madre kitchen renovation
“We knew going in whether we wanted flat-fee or cost-plus, because she laid out what each one actually discloses. That made the decision ours, not a guess.” — Client, Acequia Madre primary bedroom & bath
“The lead-time table meant we weren’t blindsided when the custom sofa took twelve weeks. It was on the schedule from day one.” — Client, Acequia Madre living room
“She kept the original plaster and the vigas and still gave us a house that works for how we actually live. The room-by-room scope kept everyone honest about what was structural and what was cosmetic.” — Client, Acequia Madre full-home remodel

Santa Fe, on purpose

About Marisol

Portrait of a professional woman, representing Marisol Griego, principal designer

Marisol Griego leads Griego Interiors, an independent residential design practice in Santa Fe, NM — a real, checkable regional design hub with a dense cluster of independent boutique studios. The region’s own building material, hand-troweled lime plaster, is this template’s ground colour, not a mood-board pick.

Lane: full-home and room-by-room residential design, hybrid fee practice — a flat fee for design phases, cost-plus disclosed on FF&E. Contact priority: LinkedIn first, email second.

Credentials

Training

Interior design coursework and a residential-design practicum, with continuing education in FF&E procurement and building codes.

Professional affiliation

Practices under the ASID Code of Ethics’ disclosure requirements (Section 3.3), the standard this page’s FF&E schedule is built to satisfy.

Santa Fe studio

Based in Santa Fe, working within the region’s adobe-construction vocabulary — vigas, hand-troweled plaster and saltillo tile.

Close-up of a sand-finish stucco wall

Sand-finish stucco — the exterior surface of most newer Santa Fe–style houses, which imitate adobe over a frame or block wall. Shown as a material reference, not as a Griego Interiors project.

Glossary

FF&E
Furniture, fixtures and equipment — everything specified and procured for a project, tracked on the FF&E schedule.
COM
Customer’s own material — fabric a client supplies for a piece to be upholstered in, common on custom orders.
Trade-only
A vendor or showroom that sells only to licensed design professionals, not directly to the public.
Spec
The specification for a single item — dimensions, finish, vendor and price — as it appears on a schedule.
Punch list
The list of small corrections identified at the final walk-through, before a project is considered complete.
Lead time
The time between placing an order and receiving the goods, tracked by category on the procurement table.

Fee models, procurement, disclosure & exceptions

FAQ

Common questions

Which fee model will my project use?

Most engagements are hybrid: a flat fee for the design phases, and cost-plus (disclosed markup) on FF&E. The fee-model comparison table above lays out all four models so you can ask the right questions before signing.

How accurate are the lead times you quote?

The procurement lead-time table gives typical ranges by category, sourced from current trade and vendor data. Custom upholstery and imported goods carry the widest ranges — those are flagged as such, not promised as fixed dates.

Why do I see a markup on some items and not others?

Under a cost-plus agreement, FF&E is marked up per ASID’s Code of Ethics, Section 3.3, which requires all compensation to be disclosed in writing. Under a flat-fee agreement, design time is billed directly and there is no per-item markup to disclose.

What happens if a custom item is returned?

Deposits on custom upholstery are standardly non-refundable once fabric has been cut or the piece has been sewn to order — this is disclosed before any custom order is placed, not after.

What if an item is discontinued or backordered?

The vendor notifies us as soon as a discontinuation or extended backorder is known, and we bring you a substitute at the same trade-cost tier before re-issuing a purchase order.

Can you work alongside my own contractor or architect?

Yes — most full-home remodels involve a general contractor and sometimes an architect. The finish schedule and room-by-room scope tables are built to be shared directly with your other trades.

Start a conversation

Discovery-call / room-scope worksheet

A short intake for a first discovery call — not a price quote. This tells Marisol how many rooms are in scope and your rough timeline before you talk.

What happens after you submit

Marisol replies within two business days to schedule a 30-minute discovery call — no fee quote is sent by email; the fee-model comparison above is the honest substitute for a number this worksheet can’t produce on its own.

Project inquiry

A separate, more detailed intake for a client ready to start a project — not the discovery-call worksheet above.

Trade-account & vendor resources →